Schedule development: activity sequencing, dependencies (FS, SS, FF, SF), critical path, float, milestones, crashing and fast-tracking

▶ Watch the overview video

Last reviewed September 30, 2026 · Leer en español

A schedule turns the WBS (work breakdown structure) into dated activities. The project manager lists the activities needed to produce each work package, identifies milestones, estimates durations, then sequences them and finally assigns dates and resources. Sequencing is drawn as a network diagram, usually with the precedence diagramming method (PDM), where boxes (nodes) are activities and arrows are dependencies. The finished schedule is often shown as a Gantt chart, a bar chart of activities against a calendar, which is easier for stakeholders to read.

Free account

Keep reading for free

Create a free StudyToCert account to read the rest of this lesson: 7 more sections, 8 key terms, a real-world example, an exam tip and self-check questions. Every lesson, lab and practice test is free with an account.

Sign up free Log in

Study Project+ for free
A week-by-week plan with every lesson, quizzes, checkpoint tests, a practice exam and hands-on labs.
Open the Project+ study plan